Disclosure
The Board Room Marketing Firm sells marketing to home-service contractors. This page is counts from a public record, not a ranking and not an endorsement of anyone in it. No business is named.
Every permit the City of Orlando processes ends up in a public dataset. We counted the mechanical ones filed as repairs, which is where residential A/C change-outs mostly land, month by month for two years. If you run an Orlando HVAC company, this is a rough picture of how much work gets permitted, when, and how it is spread across contractors.
The short version
- 2,592 mechanical repair permits were processed from November 2025 through October 2026, up about 4% from 2,494 in the 12 months before.
- Summer is about 1.9 times winter. June to August averaged 279 a month across 2025 and 2026. December to February averaged 151.
- The busiest month was August 2026 (319). The slowest was January 2026 (135).
- The ten most frequent contractor entries filed about 36% of permits (41% if entries are grouped by licence-holder name). The market has a heavy head and a long tail.
- About half of permits are issued the same day they are processed (48.6%), and the median gap is one day.
Permits by month
Counts of City of Orlando permits with application type Mechanical Permit and work type Repair, by the month they were processed. Download the monthly counts as a CSV (no names, no addresses).
| Month | Repair permits |
|---|---|
| November 2024 | 151 |
| December 2024 | 145 |
| January 2025 | 161 |
| February 2025 | 157 |
| March 2025 | 177 |
| April 2025 | 241 |
| May 2025 | 206 |
| June 2025 | 268 |
| July 2025 | 242 |
| August 2025 | 259 |
| September 2025 | 222 |
| October 2025 | 265 |
| November 2025 | 164 |
| December 2025 | 154 |
| January 2026 | 135 |
| February 2026 | 152 |
| March 2026 | 226 |
| April 2026 | 220 |
| May 2026 | 233 |
| June 2026 | 295 |
| July 2026 | 291 |
| August 2026 | 319 |
| September 2026 | 228 |
| October 2026 | 175 |
What the mix looks like
Of the 2,592 permits in the last 12 months, 1,397 (54%) were reviewed as small residential (one or two units), 756 (29%) as residential with three or more units, and 439 (17%) as commercial. The median estimated cost across the 2,590 permits that listed one was $9,392, with the middle half between about $3,950 and $13,700. Small residential permits had a median of $11,211. We don’t know why the three-or-more-unit group sits much lower, at $3,750, and the data doesn’t say.
How concentrated the contractors are
The permit record lists a contractor field, which mixes a licence holder and a company name, so one business can appear under several entries. Taking the field exactly as filed, there were 465 distinct entries across 2,555 permits with a contractor listed (37 had none). The largest entry filed 10.7% of them and the top ten filed 36.4%. Grouping entries by the licence-holder name instead gives 410 groups, a largest share of 11.2% and a top-ten share of 41.2%. Either way, 85 to 90 entries filed five or more permits and 23 to 24 filed twenty or more, while about 200 to 240 filed exactly one.
That is a description, not a verdict. A permit count is not revenue and it is not quality. It does show that a newcomer is competing for the same homeowner searches against a few dozen companies that pull permits every week.
What a contractor can reasonably take from it
- Demand is seasonal enough to plan around. Roughly twice the permits in summer means call volume, staffing and ad budgets that make sense in January don’t make sense in July. Check the same pattern in your own call log before you act on ours.
- Same-day issuance suggests homeowners who have decided are moving fast. We haven’t measured how that affects who gets the call, so treat it as a reason to test your response time, not as a finding.
- To see where you stand, count your own permits against your own jobs. The gap is either work that never reached the public record, or the other way round.
For how Orlando HVAC companies turn searches into booked calls, see our guide to HVAC marketing in Orlando.
Method, and what this does not show
- Source: the City of Orlando’s public permit dataset (ryhf-m453 on data.cityoforlando.net). We queried it on November 25, 2026 with
application_type = Mechanical Permitandworktype = Repair, grouped byprocessed_date. - Check: the city’s own server-side count matched ours exactly for both 12-month periods (2,592 and 2,494).
- “Repair” is a filing category, not proof of A/C. The dataset has no field that says what equipment was replaced. Where a project name identifies the work (about one in five do; most are owner names or addresses), it is overwhelmingly A/C, air handler, heat pump or condenser work. We have not verified the rest.
- City of Orlando only. Unincorporated Orange County, Winter Park, Lake Mary, Kissimmee and other cities keep separate records and are not in these numbers.
- Permits are a floor. Work done without a permit is not counted, and one permit can cover more than one unit.
- Dates and costs: counts use the processed date, not the completion date. Estimated cost is what the applicant wrote down.
- Contractor names are not published here. Entries vary in spelling and format, so any named ranking would be less accurate than it looks.
- November 2026 is excluded because the month is not finished.
We’ll refresh these figures with the same query. If you spot a mistake, tell us and we’ll correct the page and note the change.
